Simply enter basic information about your operations below and receive your free report.
Please note: We've pre-populated the fields below with averages we’ve seen while working with our coal mining customers.
Results
Thank you for using Gates iLok Calculator. Below you'll find a summary of the time and cost savings you could achieve by switching from standard staple-lock couplings to iLok couplings.
Total Savings and Productivity Gain
$0.00
| Time Savings | Staple-Lock | iLok |
|---|---|---|
| Time to Disconnect One Connection | 0 | 0 |
| Number of Assemblies Per Shield | 0 | 0 |
| Time Per Shield | 0 | 0 |
| Number of Shields | 0 | 0 |
| Number of Connections | 0 | 0 |
| Time for All Shields in a Longwall Move | 0 | 0 |
| 0 | 0 | |
| 0 | 0 |
| Cost Savings Per Connection | Staple-Lock | iLok |
|---|---|---|
| Hourly Wage | 0 | 0 |
| Time to Disconnect One Coupling | 0 | 0 |
| Cost to Disconnect One Coupling | 0 | 0 |
| Cost to Disconnect Couplings Per Shield | 0 | 0 |
| Cost to Disconnect All Couplings and Shields | 0 | 0 |
| Labor Savings - Disconnect | Staple-Lock | iLok |
|---|---|---|
| Number of Workers to Disconnect for Move | 0 | 0 |
| Number of Days to Disconnect | 0 | 0 |
| Number of Hours Per Workshift | 0 | 0 |
| Number of Hours to Disconnect | 0 | 0 |
| Hourly Wage | 0 | 0 |
| Total Disconnection Labor Costs | 0 | 0 |
| Labor Savings - Reconnect | Staple-Lock | iLok |
|---|---|---|
| Number of Workers to Reconnect After Move | 0 | 0 |
| Number of Days to Reconnect | 0 | 0 |
| Number of Hours Per Workshift | 0 | 0 |
| Number of Hours to Reconnect | 0 | 0 |
| Hourly Wage | 0 | 0 |
| Total Reconnection Labor Costs | 0 | 0 |
| Cost of Replacing Destroyed Hoses | Staple-Lock | iLok |
|---|---|---|
| Percentage Hose Assemblies Destroyed During Move | 0 | 0 |
| Cost of Hose Assembly | 0 | 0 |
| Cost of Hose Assembly Replacement | 0 | 0 |
| Cost of Safety Incidents | Staple-Lock | iLok |
|---|---|---|
| Safety Cost Per Incident | 0 | 0 |
| Number of Incidents Per Longwall Move | 0 | 0 |
| Total Costs of Safety Incidents Per Move | 0 | 0 |
| Productivity Gain | Staple-Lock | iLok |
|---|---|---|
| Number of Workers to Disconnect | 0 | 0 |
| Number of Simultaneous Disconnections | 0 | 0 |
| Time for Disconnect | 0 | 0 |
| Total Time Used | 0 | 0 |
| 0 | 0 | |
| Added Productivity Time on Disconnect | 0 | |
| Number of Workers to Reconnect | 0 | 0 |
| Number of Simultaneous Disconnections | 0 | 0 |
| Time for Reconnect | 0 | 0 |
| Total Time Used | 0 | 0 |
| 0 | 0 | |
| Added Productivity Time on Reconnect | 0 |
| Savings Per Longwall Move | iLok |
|---|---|
| Labor Savings (Disconnect/Reconnect) | 0 |
| Replacement Savings | 0 |
| Safety Savings | 0 |
| Potential Savings on Longwall Move | 0 |
| Productivity Summary | iLok |
|---|---|
| Total Added Productivity Time (Hours) | 0 |
| Hourly Production (Tons/Hour) | 0 |
| Price of Coal | 0 |
| Total Incremental Cash Flow for the Mine | 0 |