Simply enter basic information about your operations below and receive your free report.

Please note: We've pre-populated the fields below with averages we’ve seen while working with our coal mining customers.

Current Staple-Lock Time Investment

Current Staple-Lock Labor Costs

  1. Disconnection

  2. Reconnection

Current Cost of Replacing Destroyed Hoses

Current Safety Costs

Current Production Factors

 

Results

Thank you for using Gates iLok Calculator. Below you'll find a summary of the time and cost savings you could achieve by switching from standard staple-lock couplings to iLok couplings.

Total Savings and Productivity Gain

$0.00

Time Savings Staple-Lock iLok
Time to Disconnect One Connection 0 0
Number of Assemblies Per Shield 0 0
Time Per Shield 0 0
Number of Shields 0 0
Number of Connections 0 0
Time for All Shields in a Longwall Move 0 0
0 0
0 0
Cost Savings Per Connection Staple-Lock iLok
Hourly Wage 0 0
Time to Disconnect One Coupling 0 0
Cost to Disconnect One Coupling 0 0
Cost to Disconnect Couplings Per Shield 0 0
Cost to Disconnect All Couplings and Shields 0 0
Labor Savings - Disconnect Staple-Lock iLok
Number of Workers to Disconnect for Move 0 0
Number of Days to Disconnect 0 0
Number of Hours Per Workshift 0 0
Number of Hours to Disconnect 0 0
Hourly Wage 0 0
Total Disconnection Labor Costs 0 0
Labor Savings - Reconnect Staple-Lock iLok
Number of Workers to Reconnect After Move 0 0
Number of Days to Reconnect 0 0
Number of Hours Per Workshift 0 0
Number of Hours to Reconnect 0 0
Hourly Wage 0 0
Total Reconnection Labor Costs 0 0
Cost of Replacing Destroyed Hoses Staple-Lock iLok
Percentage Hose Assemblies Destroyed During Move 0 0
Cost of Hose Assembly 0 0
Cost of Hose Assembly Replacement 0 0
Cost of Safety Incidents Staple-Lock iLok
Safety Cost Per Incident 0 0
Number of Incidents Per Longwall Move 0 0
Total Costs of Safety Incidents Per Move 0 0
Productivity Gain Staple-Lock iLok
Number of Workers to Disconnect 0 0
Number of Simultaneous Disconnections 0 0
Time for Disconnect 0 0
Total Time Used 0 0
0 0
Added Productivity Time on Disconnect 0
Number of Workers to Reconnect 0 0
Number of Simultaneous Disconnections 0 0
Time for Reconnect 0 0
Total Time Used 0 0
0 0
Added Productivity Time on Reconnect 0
Savings Per Longwall Move iLok
Labor Savings (Disconnect/Reconnect) 0
Replacement Savings 0
Safety Savings 0
Potential Savings on Longwall Move 0
Productivity Summary iLok
Total Added Productivity Time (Hours) 0
Hourly Production (Tons/Hour) 0
Price of Coal 0
Total Incremental Cash Flow for the Mine 0